Hall, Kitchen & Bathroom Tiling, Ms Nugent

Job details:

  • Tiles: Ceramic slate effect floor tiles
  • Date: July 2007
  • Completion Time: 2 Days
  • Job Type: Domestic

On this job I tiled the hall, kitchen and bathroom floor, running seamless from one room to another. I also had to cut around the toilet and sink pedistals.

Customer Feedback

  1. Leigh Nugent
    Posted July 10, 2007 at 2:09 pm | Permalink

    I hired Matt to tile my hallway, kitchen and bathroom floor in my flat. As the flat was quite small, and the bathroom and kitchen were directly off of the hallway, I specified that I wanted the tiles to run through into all 3 rooms with no breaks between.

    Matt completed the job within 2 days, exactly as I had hoped it would turn out. He was very pleasant and dealt with all my numerous questions without any bother. There was minimum disruption to the flat and he made sure everything was left as he found it!