Hall & Kitchen Tiling, Mr George

Job details:

  • Tiles: Large format glazed porcelain tiles
  • Date: March 2007
  • Completion Time: 4 Days
  • Job Type: Domestic

The photo shown is of the kitchen floor, however, the full job comprised of tiling through the front hallway, into the kitchen and then onto the utility room and small adjoining toilet.

As all the rooms flowed into one another this job involved thorough planning of the tile layout to ensure there were no breaks in the tile betweens the rooms.